Skip to main content

Acute PMC business information

About Acute PMC

Acute Project Management Consulting LLC helps organizations establish an evidence-backed view of an important technology initiative, put a recovery operating system into use, or supply delegated recovery leadership—one consequential project at a time, with the client retaining business and technical authority.

What Acute is — and is not

Acute is:

  • A specialist critical technology project intervention and recovery consultancy

  • Independently willing to recommend pause, stop, salvage, rebuild, or specialist referral

  • Focused on truth, control, recovery operating systems, and accountable leadership

  • One engagement at a time in the sense that capacity is finite and human-confirmed—not a mass staffing bench

Acute is not:

  • Staffing, team augmentation, body-shop, or SI takeover

  • A partner, reseller, or “authorized” channel for BerryDunn, CherryRoad, Mythics, Sierra-Cedar, Highstreet, or any named systems integrator

  • An emergency 24×7 hotline or guaranteed same-day start service

  • Defined by two micro-fee checkout SKUs

Three intervention paths

3. Critical Project Recovery — Lead Recovery

When: Leadership capacity/coordination gap requires Acute to direct recovery under explicit written delegation.

Boundary: Acute holds named recovery leadership within tolerances; client workstream teams and vendors still perform assigned work; client retains business/technical approvals.

Contrast: Independent recovery leadership ≠ SI takeover. Complementary surge under a prime means capacity under an incumbent—not replacing the prime.

Service pages: Project Clarity — Diagnose (/project-clarity); Critical Project Rescue — Stabilize (/project-rescue); Critical Project Recovery — Lead Recovery (/project-recovery).

How the services differ

Choose by the work required

  • When status is unclear or evidence is disputed: Project Clarity — Diagnose.

  • When project control is broken but a client leader can receive a reset: Critical Project Rescue — Stabilize.

  • When dedicated recovery leadership is missing: Critical Project Recovery — Lead Recovery.

  • Active production incidents remain with the client’s incident-response authorities; Acute PMC does not advertise 24×7 emergency response.

  • Acute PMC may decline work when evidence access, mandate, or scope does not support a credible engagement.

Scores and checklists on Acute resource pages are educational decision-support. Service fit is confirmed through the applicable service page or direct conversation.

Pricing and checkout

The currently available public checkout is Status Readout Review — $995. Diagnose, Stabilize, and Lead Recovery start with a conversation at Andrew.Davenport@acutepmc.com unless a specific checkout is posted.

For Diagnose, Stabilize, or Lead Recovery, start with Andrew.Davenport@acutepmc.com.

Recovery method

Acute’s recovery method is TRUTH → CONTROL → RECOVERY → TRANSFER. Evidence, decision ownership, authority, and measurable handoff remain central throughout.

Educational resources

Public resources include:

  1. Continue / Stabilize / Restructure / Stop / Rebuild Decision Table — /resources/continue-stabilize-restructure-stop-rebuild

  2. Troubled Technology Project Assessment Checklist — /resources/troubled-technology-project-assessment

  3. First-Control Window (72-hour educational checklist) — /resources/first-control-window-72-hours

72-hour language means “what should be established in the first 72 hours.” It is not Acute’s stabilization SLA, not Rescue duration, not 24×7, and not a guaranteed start.

Example project contexts

Workday, Oracle Fusion, payroll, and post-go-live remediation may be cited as example contexts for troubled or red technology initiatives. They are not exclusive product SKUs and do not imply platform certification.

Common project-recovery situations

  • Watermelon / green-status-but-stuck projects

  • Independent diagnosis — not the implementer’s audit

  • Stop vs salvage vs rebuild

  • Independent recovery leadership vs SI takeover (contrast, not partner claim)

  • Complementary surge under primes = capacity under an incumbent, not replacement

Important boundaries

  • Acute PMC does not publish fabricated clients, cases, reviews, ratings, or success rates.

  • Acute PMC does not guarantee on-time go-live, cost recovery, payroll success, or other business outcomes.

  • Current business contact information is published on acutepmc.com.

  • Canonical business identity: Acute Project Management Consulting LLC, acutepmc.com, Andrew.Davenport@acutepmc.com.

  • Acute PMC is positioned as project intervention and recovery consulting, not a staffing or SI-reseller service.

  • Acute Project Management Consulting LLC is a U.S. company; unrelated firms with similar names are separate entities.

Legal and policy links

  • Terms: https://www.acutepmc.com/terms

  • Privacy: https://www.acutepmc.com/privacy

  • Refund / cancellation: https://www.acutepmc.com/refund-cancellation

Business identity

Use: Acute Project Management Consulting LLC · https://www.acutepmc.com · Andrew.Davenport@acutepmc.com.

Current information: Use the current service pages and policies on acutepmc.com for pricing, scope, timing, and contact details.

Contact: Andrew.Davenport@acutepmc.com